By WilliamMarkDesigns | Atlanta Home Builder & Developer
Most people picture construction as the moment a home begins. The crew shows up, the machinery rolls in, and something visible starts to take shape. But by the time we break ground at WilliamMarkDesigns, months of deliberate work have already happened — and that work is what makes the difference between a home that gets built right and one that gets built fast.
If you're buying pre-sale, or even just curious about how new construction actually comes together, here's what happens before a single shovel hits the ground.
The Pre-Construction Phase, Explained
Pre-construction is exactly what it sounds like: everything that has to be figured out, agreed on, and approved before physical work begins. For us, this phase typically spans several months and involves the builder, the design team, the city, and often the buyer themselves.
This is not idle time. It's the phase where the most consequential decisions get made — decisions about layout, materials, structure, and code compliance that are exponentially harder to change once concrete has been poured. Getting this phase right is what allows construction to move quickly once it starts.
Design, Drawings, and Permits
Before any city will issue a building permit, they need to see the plans — and those plans take time to produce. Here's how it unfolds:
Architectural drawings. Our design team produces full construction drawings: floor plans, elevations, structural details, electrical layouts, and mechanical systems. These aren't rough sketches. They're the technical documents that contractors, inspectors, and subcontractors will reference throughout the entire build.
Engineering review. Structural and civil engineers review the drawings to confirm the design can handle load, drainage, and site-specific conditions. In Atlanta, this is especially important for infill lots in older neighborhoods where soil conditions and lot geometry vary significantly.
City permitting. Once drawings are finalized, they're submitted to the City of Atlanta for a building permit. Permit review timelines in Atlanta can range from a few weeks to several months depending on the project type, zoning classification, and current backlog at the Office of Buildings. We factor this into every project timeline from the start.
Survey and site prep approvals. Before ground is broken, a licensed surveyor stakes the lot and confirms setbacks, easements, and boundaries. Any tree removal requires a separate City of Atlanta arborist permit — something that catches first-time developers off guard but that we plan for on every project.
What You Can Customize Before Ground Breaks
One of the biggest advantages of buying at the pre-construction stage is the ability to influence what gets built. At WilliamMarkDesigns, pre-sale buyers have input on the decisions that matter most:
Interior finish packages — cabinetry style, countertop material, flooring, tile selections, and hardware
Layout modifications — on select projects, structural changes like wall placement or room function can still be accommodated
Optional upgrades — features like a home gym, wet bar, rooftop lounge, or guest suite addition (where the floor plan allows)
Exterior details — color palette, garage door style, and landscaping direction
The earlier you're under contract, the more flexibility you have. Once framing begins, most structural decisions are locked. Finish selections can often be made later, but the best options go to buyers who are in earliest.
Our current pre-construction opportunity — 1111 Boulevard Drive NE in Reynoldstown — has two units available with customizable finish packages and optional upgrades still on the table.
The Timeline: From Contract to Groundbreaking
Every project is different, but here's a realistic picture of what the pre-construction window looks like on a typical WilliamMarkDesigns new build:
This is why pre-sale buyers who get under contract early have an advantage — they're locking in price and customization options during a phase that's already in motion. By the time permits are issued and groundbreaking happens, the buyer who waited has often missed their window to influence anything.
Why Buying Before Ground Breaks Works in Your Favor
There's a reason experienced Atlanta buyers specifically seek out pre-construction opportunities — and it's not just about customization.
You lock in today's price. New construction prices tend to rise as a project progresses. Early buyers secure their contract price before the builder's costs increase and before the market moves.
You're not competing with other buyers on closing day. A finished home in a desirable intown neighborhood attracts multiple offers. A pre-construction contract is typically a one-on-one transaction between you and the builder.
You have time to prepare. The 5–9 month pre-construction window gives buyers time to get financing in order, sell an existing home if needed, and make decisions without pressure.
You get a truly new home. No deferred maintenance, no inherited design choices, no negotiating around someone else's taste. Everything is new, warranted, and built to current code.
For buyers who've done their homework on a neighborhood and know they want to be there, pre-construction is often the most financially sound way to get in.
See It for Yourself
We're currently pre-selling at 1111 Boulevard Drive NE in Reynoldstown — two new construction units with rooftop terraces, 2-car garages, and finish packages still available for personalization. Groundbreaking is approaching, which means the customization window is open now, not later.
If you want to see the floor plans, understand what's still customizable, or just ask a question before you're ready to commit, reach out to our team. We'd rather answer ten questions early than have you miss your window.
Interested in 1111 Boulevard? View the listing or contact us to get the full marketing packet.